Pacific Computers delivers audio-visual solutions across the University of Birmingham’s new Dubai campus
Over a six-month period, Pacific supplied and installed AV technology across teaching, meeting and specialist learning spaces, supporting the launch of the University of Birmingham’s state-of-the-art Dubai campus.
Over a six-month period, Pacific Computers Ltd supplied and installed audio-visual equipment across the entirety of the University of Birmingham’s new Dubai campus.
Having been invited to tender for the project in late 2020, Pacific Computers’ audio-visual expertise gave the University confidence that the project would be completed to a professional standard. The requirement called for the delivery of audio-visual solutions across a wide range of spaces, including teaching rooms, meeting rooms, wet and dry labs, e-labs and a 250-seat lecture theatre.
The Solution
With the system designed in-house by the University of Birmingham UK, it was paramount that the project encompassed the best and most suitable technology for the University's needs. As a result, Extron switching and controls, including an early Extron NAV System, were used alongside WolfVision visualisers, Sennheiser microphones and Panasonic displays and projectors. Crestron was used for all meeting rooms, while Top Tec lecterns were installed throughout the teaching spaces.
Teams
Pacific worked closely with the University of Birmingham Dubai estates team, Aesthetix Technologies and Visualization
How We Did It
To ensure the smooth running of this overseas project, Pacific partnered with Aesthetix Technologies to undertake the maintenance, servicing, installation and programming of the equipment. Visualization also supported the project by building the equipment racks in the UK before they were shipped to the Dubai campus as arranged by Pacific.
A close working relationship proved to be a crucial element of the project’s success, with Pacific Account Manager Steve Wilkes maintaining constant contact with the University of Birmingham Dubai estates team throughout. Having received the purchase order in March 2021, the vast majority of the installation work was completed by September 2021.
Results
The successful delivery of the project established an ongoing relationship between Pacific and the University of Birmingham. Following completion of the original installation, Pacific has continued to supply and install audio-visual solutions in additional rooms that were not included within the original tender, demonstrating the success of the partnership and the confidence placed in Pacific’s expertise.
Client Testimonial
“UCL East represents a huge real Estate Investment for UCL, and Marshgate is one of the largest teaching, practice, laboratory, and mixed-use buildings we have, and it represents a different way of working at UCL. I was working on this project for over five years since joining UCL in 2019, so Marshgate had to be a successful project, delivered in good time to an excellent standard. As the AV community knows, the Covid Pandemic had a huge impact on manufacturing and the availability of hardware globally and the UCL East project was impacted by these delays. From Pacific being appointed to the project, they immediately started working with us, as quickly as possible to mitigate these delays and find alternative equipment where required against a changing picture of global availability. The account management and ordering were progressed as quickly as possible, and throughout the process Pacific were flexible, communicative, and helpful with offering alternatives, based on system designs and functionality, to ensure functional requirements were met.
“During installation, in a building of this size, with 32 teaching spaces, around 40+ meeting rooms, plus a variety of lab and departmentally focused spaces to deliver, Pacific’s installation team remained calm, worked flexibility and were communicative throughout the three plus month installation window. As a delivery focused client, what I really appreciated was – if for some reason Pacific’s team could not progress work as planned in one space, they would proactively move to another room to carry on working and communicate clearly, helpfully, and percipiently to allow issues to be resolved so that no time on site was lost.
The installation project manager was on site frequently and between the account manager and the project manager, plans would be regularly updated and any blockers fed back with suggestions for resolution. We even had to re-design the AV provision for a lab space, due to user requirements changing in July and deliver this for September teaching! When some spaces inevitably hit issues, close to project deadlines, as can happen on a large complex site, Pacific responded by sending additional people to site and ensuring the job was completed in time.
Programming for spaces was designed based on UCL existing code, and to communicated functionality and requirements. Small tweaks and changes were not seen as a problem, and the more unusual code requirements were well designed, delivered in a collaborative fashion on site, and if end users made additional requests these were met with a helpful, understanding and flexible attitude. Nothing was too much trouble to ensure code was delivered within UCL’s standards, adapted to meet different room and user requirements, and delivered as fully functional for teaching in September.
Overall, Pacific were a huge part of delivering the Marshgate project at UCL and throughout some inevitably stressful times to meet the looming deadline of building opening, occupation and start of teaching, Pacific always worked as collaborative partners and were as focused as me, their client on ensuring all rooms were delivered within project deadlines, delivered as “right first time”, and that overall the project was delivered to deadline, to requirements and was a huge success.”
— Sheila Egan, ISD Customer Operations, UCL